Senior Project Scheduler /​ Project Planning Engineer

孟买, 马哈拉施特拉邦, 印度 — thyssenkrupp nucera India Private Limited


合同类型:全职, 正式工
经验水平:经验丰富的专业人员
远程工作:不支持
工作领域:工程与科学
状态:持续招聘,入职日期灵活
发布日期:2026/10/25
工作编号:WW_DT_nucera00678
分享工作:

你的责任

We are looking for an experienced Senior Project Scheduler / Project Planning Engineer to support the planning, monitoring, and control of a complex EPC / industrial project. The role is responsible for developing and maintaining integrated project schedules, coordinating interfaces across disciplines and partners, and providing reliable schedule analysis to support project decision-making.

The position requires strong planning expertise, confident stakeholder coordination, and excellent English communication skills for working with international project teams, clients, consortium partners, contractors, and suppliers.

  • Develop, maintain, and control integrated project schedules covering engineering, procurement, fabrication, manufacturing, logistics, erection, commissioning, and related project activities.
  • Review contractual and execution requirements, including milestones, assumptions, constraints, interfaces, planning obligations, approved baselines, and re-baselining processes.
  • Coordinate with internal teams, consortium partners, vendors, subcontractors, and client representatives to collect progress data and maintain accurate schedule updates.
  • Perform critical path, float, risk, delay impact, forecast, and what-if analyses to identify schedule deviations and support project decisions.
  • Propose mitigation, acceleration, or recovery measures in coordination with project management.
  • Prepare schedule and progress reporting, including schedule updates, milestone tracking, look-ahead schedules, variance analyses, S-curves, dashboards, forecasts, and management summaries.
  • Support project controls, risk management, cost control, performance monitoring, change management, and contractual schedule reporting by providing reliable schedule input and impact assessments.

您的资料

  • Bachelor’s degree in Engineering, Project Management, Construction Management, or a related discipline.
  • Over ten years of experience in project planning, scheduling, and project controls, preferably in EPC, industrial, energy, hydrogen, oil & gas, petrochemical, power generation, or other capital-intensive projects.
  • Hands-on experience with Primavera P6 is obligatory, additionally Microsoft Project would be beneficial.
  • Strong understanding of project scheduling and project controls, including critical path methodology, baseline and schedule control, progress measurement, earned value management, schedule risk analysis, and recovery planning.
  • Experience in forecasting, performance reporting, change management, contractual schedule reporting, and assessing schedule impacts, including Extension of Time (EoT) requirements arising from contractual or project-related changes.
  • Proven experience coordinating schedules in consortium, joint venture, or multi-contractor EPC environments with complex interfaces between partners, contractors, suppliers, and client representatives.
  • Experience preparing management reports, S-curves, milestone reports, look-ahead schedules, dashboards, forecasts, and executive progress summaries.
  • Excellent written and spoken English is mandatory.
  • Ability to prepare clear schedule reports, planning inputs, presentations, and management summaries in English.
  • Ability to communicate confidently with international project teams, clients, consortium partners, contractors, and suppliers.
  • Strong facilitation skills for planning meetings, schedule reviews, and guide peers and progress discussions across organizational and cultural interfaces.
  • Experience in hydrogen, electrolysis, renewable energy, process plants, industrial manufacturing, or modular package delivery projects.
  • Additional exposure to large-scale international EPC projects with complex partner and subcontractor interfaces would be advantageous.
  • Hands-on involvement in delay analysis, claims support, or forensic schedule review would be an advantage.
  • PMP, PMI-SP, or similar project management / scheduling certification would be an advantage.
  • Familiarity with ERP systems such as SAP or Microsoft Dynamics would be beneficial.
  • Strong analytical and problem-solving mindset.
  • Highly organized, detail-oriented, and reliable in handling large volumes of project data.
  • Strong stakeholder management skills across different management levels and ability to drive alignment without direct authority.
  • Confident communicator who can challenge schedule inputs constructively.
  • Able to work in a fast-paced project environment with multiple priorities and under pressure.
  • Willingness to travel domestically and internationally when required and able to stay abroad for particular period as per project and company demands.

对我们很重要

Health and Wellness

健康与安全

健康与安全:最高标准和全方位的健康与安全保障

健康与安全:最高标准和全方位的健康与安全保障

Pension and Retirement

退休金

我们为个人提供不同财务支持。

我们为个人提供不同财务支持。

Collaboration and Teamwork

协作

协作是非常重要的--我们以尊重和赞赏的态度对待每个人。

协作是非常重要的--我们以尊重和赞赏的态度对待每个人。

Professional Development

发展

培训和教育计划,帮助你在专业和个人方面的发展。

培训和教育计划,帮助你在专业和个人方面的发展。

Compensation and Salary

薪酬和福利

公平的工作条件和有竞争力的薪酬是我们的一个重要基础。

公平的工作条件和有竞争力的薪酬是我们的一个重要基础。

Diversity and Inclusion

多样性

我们提倡一种开放和宽容的工作文化。

我们提倡一种开放和宽容的工作文化。

Work-Life Balance

工作与生活的平衡

工作与生活的平衡:我们支持工作与生活的平衡。

工作与生活的平衡:我们支持工作与生活的平衡。

Creative and Innovation

创意空间

我们提供宽松和鼓励创新的工作环境。

我们提供宽松和鼓励创新的工作环境。

Vacation and Time Off

假期和带薪休假

假期和带薪休假。带薪休假、病假。

假期和带薪休假。带薪休假、病假。

Sustainability and Environment

可持续发展

我们以责任心和环保意识行事。

我们以责任心和环保意识行事。

Onboarding and Training

入职培训

入职培训:提供个人支持,帮助你开始新的工作。

入职培训:提供个人支持,帮助你开始新的工作。

我们重视多样性

The company is committed to strengthening diversity and inclusion at the workplace. It strives to create an inclusive work environment where employees can develop to achieve their full potential and a culture that welcomes differences and creates a sense of belonging.

公司简介

thyssenkrupp nucera offers world-leading technologies for high-efficiency electrolysis plants. The company has extensive in-depth knowledge in the engineering, procurement, and construction of electrochemical plants and a strong track record of more than 600 projects with a total rating of over 10 gigawatts already successfully installed. With its water electrolysis technology to produce green hydrogen, the company offers an innovative solution on an industrial scale for green value chains and an industry fueled by clean energy a major step towards a climate-neutrality. thyssenkrupp nucera successfully made an IPO in July and is a member of the SDAX of the Frankfurt Stock Exchange since September 2023. www.thyssenkrupp-nucera.com

从收到你的文件到录取:申请过程

第1步

在线申请

你是否发现了一个有趣的职位空缺?那就在线申请吧。10分钟即可完成申请。

第2步

收到您的申请

你会收到我们收到你的申请的确认--如果你在网上申请,几分钟内就会收到;如果你通过电子邮件申请,可能需要几天时间。我们的招聘人员会检查您的申请文件并与您取得联系。对于某些职位,我们会与您进行初步的电话面试。

第3步

按职能查看

我们的招聘人员会将初步选定的候选人提交给专业部门考虑。然后,该部门将仔细检查你的资格是否符合工作要求。

第4步

面试

如果你是该职位的合适人选,我们很乐意邀请你与专业部门和人事部门进行一次面对面的交流!如果你或我们还有进一步的沟通需求,我们将邀请你参加第二轮面试。

第5步

工作机会

一旦我们就合同细节达成一致,我们将向您发送一份雇佣合同。当然,如果你的申请没有成功,我们也会让你知道。

第6步

与我们一起起步

欢迎加入蒂森克虏伯

第7步

入职

当你签署合同时,你迈出了进入世界最大公司之一的第一步。这是我们支持你的开始。

关于申请的说明

您将在短时间内向thyssenkrupp提交您的在线申请! 只要我们的职业网页上有该职位,您就有机会申请。

我们根据目前的情况调整了申请流程,并通过视频(不在美国)、电话以及亲自面试--在遵守适用和必要的距离和卫生规则的情况下进行面试。在申请过程中,你会从我们的招聘专家那里得到关于这个主题的详细信息,同时你可以在这里找到一般信息和 申请提示。

更多关于thyssenkrupp、我们的产品和地点的信息,可以直接在 公司网站 上找到。

我们祝愿你的申请成功,并保持健康

加入#GENERATIONTK的行列

与我们一起前进--作为同事,最重要的是作为一个团队。
携手合作,我们一起勇于创新,将未来掌握在自己手中。

类似工作

更多信息