Project Scheduler

约翰内斯堡, 豪登省, 南非thyssenkrupp Uhde South Africa Pty Ltd


合同类型:全职, 正式工
经验水平:经验丰富的专业人员
远程工作:不可能
工作领域:工程与科学
状态:持续招聘,入职日期灵活
发布日期:2024/08/08
工作编号:JPT_ALL01205
分享工作:

立即申请

立即申请,用这份充满挑战和机会的工作提升你的职业生涯!

你可以在网上找到这个招聘广告
https://jobs.thyssenkrupp.com/en/job/Project-Scheduler-约翰内斯堡?id=908408

你的责任

The successful candidate will be required to fulfil the job as summarised below, but not limited to:

Contract and Project Related Activities

  • Develop a project specific schedule management plan.
  • Review the draft schedule with the responsible team members.
  • Analyse the schedule and report on schedule risk and schedule contingency recommendations.
  • Investigate and interrogate the project team to establish progress information, risk requirements and other factors which may influence the project delivery schedule.

General Department Duties

  • Develop, update and maintain schedules for project execution.
  • Analyze and report time-critical activities and project progress.
  • Provide schedule-based forecasts.
  • Assist project management and project team to understand and use the schedule.

Quality

  • Maintain a high quality of service, support and professional output.
  • Develop and maintain best working practices for an efficient and cost-effective Project Management Office.
  • Identify any areas where improvements to service delivery are possible.

Internal and External Client Relations

  • Liaise courteously with customers, suppliers and internal colleagues and give professional advice where necessary.
  • Maintain an optimal level of service in a warm and friendly environment.

Health and Safety

  • Adhere to OSH requirements regarding safe operation of equipment and personal safety.
  • Adhere to tk Safety Health and Environment requirements.

您的资料

Education
3 year Technical qualification with an engineering background.

Additional educational Requirements:
Microsoft Office, knowledge of SAP would be an advantage.
Primavera and MS Projects.

Work Experience

  • Minimum of 5 - 10 years relevant experience in executing E / EP / EPCm / EPC contracts, preferably in the oil and gas, chemical and energy environments.
  • Experience in scheduling tasks including schedule development, update and maintenance incl. related analysis and reporting.

Experience in operating the scheduling tools and interfaces between scheduling tools and lower-level control tools.

联系我们

If you are interested and meet the requirements, please send your Curriculum Vitae to:

Recruit@thyssenkrupp.com

对我们很重要

健康与安全

健康与安全:最高标准和全方位的健康与安全保障

健康与安全:最高标准和全方位的健康与安全保障

我们重视多样性

We value diversity. Therefore we welcome all applications, irrespective of gender, nationality, ethnic and social background, religion and beliefs, disability, age, or sexual orientation and identity.

公司简介

Established in South Africa in 1959, thyssenkrupp Uhde South Africa is the local subsidiary of thyssenkrupp Uhde. Underpinned by a global footprint with local presence, we are a market-leading technology, engineering, construction and service partner for industrial plants and systems.

Combining over 100 years of global experience with over 60 years of local African know-how, thyssenkrupp Uhde Africa is a specialist provider of a range of advanced chemical technologies and integrated, environmentally friendly EPC (Engineering, Procurement and Construction) solutions and services.

从收到你的文件到录取:申请过程

第1步

在线申请

你是否发现了一个有趣的职位空缺?那就在线申请吧。10分钟即可完成申请。

关于申请的说明

您将在短时间内向thyssenkrupp提交您的在线申请! 只要我们的职业网页上有该职位,您就有机会申请。

我们根据目前的情况调整了申请流程,并通过视频(不在美国)、电话以及亲自面试--在遵守适用和必要的距离和卫生规则的情况下进行面试。在申请过程中,你会从我们的招聘专家那里得到关于这个主题的详细信息,同时你可以在这里找到一般信息和 申请提示

更多关于thyssenkrupp、我们的产品和地点的信息,可以直接在 公司网站 上找到。

我们祝愿你的申请成功,并保持健康

加入#GENERATIONTK的行列

与我们一起前进--作为同事,最重要的是作为一个团队。
携手合作,我们一起勇于创新,将未来掌握在自己手中。

类似工作

Senior Electrical Engineer

thyssenkrupp Uhde South Africa Pty Ltd, 约翰内斯堡, 南非

2024/11/19
Senior Process Engineer

thyssenkrupp Uhde South Africa Pty Ltd, 约翰内斯堡, 南非

2024/11/19
Mechanical Engineer (Fixed term Role)

thyssenkrupp Uhde South Africa Pty Ltd, 约翰内斯堡, 南非

2024/11/19
Electrical Engineer (Fixed term Role)

thyssenkrupp Uhde South Africa Pty Ltd, 约翰内斯堡, 南非

2024/11/19

更多信息